2024 Double-Glazing Scheme for Birżebbuġa Residents
The Double Glazing Scheme for Birżebbuġa residents is administered by the Regulator for Energy and Water Services with a scope to aid those households of Birżebbuġa to replace any external facing apertures which are antiquated or inefficient and change them to better sound insulating ones.
This scheme is governed by means of Government Notice 636 which was published on Friday, 24th May 2024.
Prospective applicants are invited to refer to the Guidelines to Applicants which have been prepared to assist applicants to complete the application form for a grant on double-glazing.
The application form is divided into two parts. Applicants must complete Part A of the application with their personal details. Part A must be completed and submitted to the REWS prior to the purchase and installation of the equipment. Online application is available as from 27th May 2024.
2024 Double Glazing Scheme for Birżebbuġa Residents
• Part A to be completed before purchase and installation
Upon installation and commissioning of the equipment, applicants are required to submit Part B application together with the necessary supporting documentation.
2024 Double Glazing Scheme for Birżebbuġa Residents
• Part B to be completed after installation and commissioning: Launch Online Application
1. Details of Identity card or Residence Document of the applicant;
2. Handwritten signature of applicant required on the application form.
For Part A
1. Online application form.
For Part B
1. Original Fiscal receipts;
2. Photographs of the product installed;
3. Copy of the Identity Card or Residence Document of the applicant;
4. Photocopy of five (5) year guarantee of the system;
5. Commissioning certificate issued by the installer;
6. Signed application form
Not Applicable
Not Applicable
There is no specific period for processing of applications established at law. Generally, an application is determined by the Regulator within five (5) weeks upon submission of a complete application form.
From the applicant’s side there is a six (6) month time window within which the installation and commissioning of the system must be carried out, including the submission of Part B and the related supporting documentation.
In general, the Maltese Administrative Law establishes that in the absence of a reply this is construed to be tantamount to a refusal and the applicant has a right to appeal.
Any decision taken by the Regulator, including refusal of an application for or withdrawal of an authorisation or a licence, may be subject to appeal before the Review Committee and any other means of redress as established by the Law.
You may submit the application form together with all associated documentation and relevant payments referred to in the application form either by post or by hand to:
Regulator for Energy and Water Services,
Zentrum Business Centre, Level 1,
Mdina Road,
Ħal Qormi QRM 9010,
Malta.




